Holiday Inn, Stannington, Morpeth

Holiday Inn, Stannington, Morpeth

Reducing their carbon footprint, whilst reducing their energy costs

The owner of the Holiday Inn at Stannington approached HQBS Energy Solutions following a recommendation from an industry professional. The hotel was looking to decrease its carbon footprint, whilst reducing energy costs.

Simple payback

1.8

years

Order to commission

5

months

CO2 Savings per annum

429.741

tons

Approximate until unit has been running 1 full year.

The Combined Heat and Power (CHP) needed to be integrated into an existing aging and inefficient heating system. It would have to produce hot water for the entire hotel, as well as its spa, including a jacuzzi and large swimming pool, both which have high energy needs.

After a full site survey and consultation with the owners, HQBS and the Holiday Inn agreed the Indop 140 was the best fit for the Holiday Inn’s needs. This unit will produce 99% of the building’s electrical requirements and will offer simple payback within 1.8 years.

Combined Heat and Power (CHP) creates a two-for-one energy production deal

Future-proof your business with a cost-efficient energy solution

Get in Touch